Case Studies

J Barnsley Cranes

J Barnsley Cranes

The Challenge: To design a double redundancy system to increase safety to a new level on cranes operating on a rig in the Johan Sverdrup oilfield, which has been built to NORSOK standards. This unique to market control system allows the cranes to operate with a back up system so that in the event o…

Eilbeck Cranes Australia

Eilbeck Cranes Australia

The Challenge: Banelec were called upon to design and build special control panels for Eilbeck Cranes. As the cranes were going to Sakhalin Island in Russia, special attention had to be given to the temperature requirements of the system. Banelec produced the design by calculating heat loss and vo…

SAESL (Singapore Aero Engine Services)

SAESL (Singapore Aero Engine Services)

The Challenge: Banelec were called upon to design an automation system to allow aero engine technicians to ergonomically assess all parts of the core of many variants of Rolls Royce civil aircraft aero engines without the need for stretching or crouching in awkward and potentially hazardous positio…

GKN

GKN

The Challenge: GKN are a major supplier to Jaguar Land rover and due to an expansion in their production facility we were invited to bid for the design and manufacture of the electrical component of a new production line system. The design was for a fully / semi-automatic electrical control system…